Riverside Realty Group
2053 W. First St.
Fort Myers, FL 33901
Phone: 239-313-5544

Info@RiversideFL.com

Bedrooms
Baths
Min Price
Max Price

DON'T MISS A NEW LISTING AGAIN!
Register Now
Already registered? Login

FREE AUTOMATED EMAIL UPDATES
Sign in to take advantage of all this site has to offer. Save your favorite listings and searches – also receive email updates when listings you like come on the market for free!
*Contact Information is NOT Shared*

Blog: McGregor Blvd

New Listing 1331 Morningside Dr.

Wonderful move in ready home on the river side of McGregor. Updated kitchen with loads of counter space and a fantastic farm house sink. The home also features updated baths & fixtures and has plenty of storage! The backyard is quite spacious and is completely fenced with wonderful plantings all around and a poured concrete patio which is great for entertaining. Tile throughout & wonderful open floor plan make this home a must see. Please make your appointment today


This home is featured in the McGregor Neighborhood Open House April 23,2017 from 1pm - 4 pm McGregor-Homes.com

 

Mcgregor Boulevard is heading for some changes soon.

 

The work will be from 7am to 4pm Monday through Saturday.

The City of Fort Myers, in coordination with the Florida Department of Transportation, begins work this month to replace storm drainage on McGregor Boulevard from Colonial Boulevard to Poinciana Avenue. In addition to replacing the existing pipes, the project will resurface the roadway, replace existing sidewalk where disturbed by pipe replacement, replace some signage, and update crosswalks with new striping and Americans with Disabilities Act (ADA) accommodations.  The final product will enhance the corridor by providing an upgraded drainage system and driving surface, but in general will not change the “look” of McGregor Boulevard as it is today.  The project is anticipated to be completed in fall 2018.

The City’s goal is to maintain two-way traffic on McGregor Boulevard when possible; however, even with two lanes open, motorists will experience periodic delays.  Commuters that use McGregor Boulevard and do not have a destination along the corridor should choose alternate routes during the project as delays could be substantial.  Many construction activities will require lane closures and flagging operations on McGregor Boulevard.  During some activities, vehicles will be detoured to side streets.  Motorists that must use McGregor Boulevard should plan extra travel time.  Pedestrians should also expect sidewalk detours.

The contractor will need to install storm drainage pipes, some up to 30 inches in diameter and five to six feet deep, in multiple locations across McGregor Boulevard.  Lane closures and flagging operations will be required on McGregor Boulevard during these pipe crossings.  The contractor will also need to cross some side streets with storm drainage pipe which will require residents to use alternate routes to reach their properties.  When crossing dead-end side streets, the contractor will maintain one lane for access.  Flaggers will be on-hand to assist residents.

More information can be found at improvemcgregor.com.

The Shell Factory is great for the family this Holiday Season

The Shell Factory  has been here since I was a kid.   We have had family birthday parties here.  We have enjoyed the Nature Park ,The Fun Park, and even attended a wedding one time.  There are many other things here to do.

   There website boast. "Yes, we have lots of shells, but we also have a Nature Park, Botanical Gardens, Eco Lab, Fun Park with Bumper Boats, Paddle Boats, Game Room & the Soaring Eagle Zipline, a huge retail store with FOUR FREE Museums, restaurants, outdoor dining & bars AND we are Pet Friendly except in the Nature Park and inside Capt'n Fishbones!"

 

                 

Real Estate Websites by iHOUSEweb iconiHOUSEweb | Admin Menu